Flagship site — Michigan

Purpose-built for AI. Powered by cheap American electricity.

Digital Strategies US (OTC: DSUS) turns low-cost U.S. power assets into high-density GPU capacity for AI training and inference.

Our data centers aren't just built. They're engineered around the one input everyone else is short of — power.

Power position
Contracted DTE Electric, Rate Schedule D13

We hold the utility position first. It sets the cost floor for everything built above it.

Flagship site
Michigan United States

High-capacity grid access and heavy industrial infrastructure already in the ground.

Build model
Replicable One blueprint, many regions

Engineered once in Michigan, then repeated wherever power is cheap and firm.

Designed for AI, not retrofitted for it.

Hyperscaler designs from the cloud era can't carry today's GPU power and cooling loads. Every layer of our facilities is specified for dense AI workloads from the slab up.

Liquid cooling as standard

Immersion and cold-plate systems hold thermal stability at rack densities air cooling can't reach, and keep PUE low through Michigan's temperature swings.

High-density rack architecture

Halls are laid out around modular GPU blocks, so capacity lands in cycles measured in months and refreshes without redesigning the building.

Programmable power supply

Grid interconnection today, with gas and future SMR optionality — redundant, dispatchable supply behind a load that cannot afford to sag.

Overhead busway Liquid coolant loop — supply and return
Data hall schematic — overhead power distribution, liquid coolant loop, modular GPU racks.

Speed to market.

We control the stack from the power contract to the rack. Fewer handoffs, fewer counterparties, and capacity that scales in months rather than years.

Power secured first

We start from a signed utility position instead of hunting megawatts after the shell is up. That's what sets the cost floor for everything above it.

Modular deployment

Standardized GPU blocks and prefabricated cooling skids compress the build schedule and take custom engineering off the critical path.

A blueprint, not a one-off

Michigan is engineered once and repeated. Each additional site inherits a proven design, vendor list and commissioning sequence.

The Digital Strategies compute platform.

Four owned layers. Power in at the base, compute out at the top.

Energy layer

Contracted, low-cost supply

The cost floor for everything built above it.

  • Low-cost U.S. power
  • Grid, gas and future SMR optionality
  • Redundant, programmable supply
  • High-reliability load support
Cooling layer

Thermal headroom

What lets racks run dense and stay stable.

  • Immersion and cold-plate liquid cooling
  • PUE optimization
  • High-density GPU thermal stability
Compute layer

AI-native halls

Built to fill fast and refresh on short cycles.

  • AI-ready rack architecture
  • Modular GPU blocks
  • Rapid deployment cycles
Replication layer

One design, many sites

Built once in Michigan, repeated region by region.

  • Michigan flagship site
  • Standardized, repeatable blueprint
  • Multi-region expansion roadmap
Utility interconnection Switchgear and distribution Data halls
Power topology — utility feed, transformation, distribution, halls.
Michigan Flagship site Additional energy-advantaged regions under evaluation
Expansion map — Michigan first, then replication into low-cost power markets.
Flagship site

Michigan AI compute facility.

Our Michigan site is the first node in a national network of energy-advantaged AI compute facilities — and our commercial validation asset. It proves we can deploy scalable, efficient compute on a schedule and at a cost that holds.

  • Stable, low-cost power
  • Strong industrial infrastructure
  • High-capacity grid access
  • Ideal for high-density workloads

Site details

Location
Michigan
Status
Flagship — expansion underway
Utility
DTE Electric, Rate Schedule D13
Supply
Grid, with gas and SMR optionality
Cooling
Immersion and cold plate
Design
Modular high-density AI racks
Role
Blueprint for multi-region rollout
Substation and transformer yard Data halls Cooling plant
Michigan campus plan — substation, transformer yard, data halls, cooling plant.

Three products off one asset.

A site can be sold at any rung of the ladder, so revenue starts well before the last GPU is racked. That's diversified income across the whole build-out — and hyperscaler-level scalability at the top.

Powered land

Entitled, interconnected acreage delivered ready to build.

Powered shell

Building, power distribution and cooling ready for a tenant's hardware.

Full turnkey compute

Racked, cooled and operated GPU capacity, sold as compute.

Investors

A high-growth AI infrastructure platform.

The combined entity will raise capital to expand GPU capacity and secure additional power sites, and to replicate the platform across multiple U.S. regions.

Use of capital

  • Michigan expansion
  • GPU cluster deployment
  • Multi-site rollout
  • Energy integration
  • Liquid cooling systems

Why invest

  • AI compute demand is compounding
  • Energy-efficient infrastructure is scarce
  • U.S.-based assets command premium valuations
  • Energy-first compute platforms are attracting major capital

A team that has built the hard part before.

Digital Strategies US is led by operators who have financed and built physical infrastructure — not a software team learning the grid on the way. We're building the next generation of U.S. AI infrastructure, starting with Michigan.

Where our experience comes from

  • Energy systems
  • Data center engineering
  • High-density compute
  • Modular infrastructure
  • Capital markets

Ready to build something enormous?

Whether you're a hyperscaler, an AI startup, an enterprise or an investor — we can get you compute faster, cheaper and more reliably.